Remote monitoring and CCTV backhaul rarely fail in isolation. They fail when a supporting service changes underneath them. For many UK sites, that service is the public switched telephone network, or PSTN. Openreach intends to retire the PSTN on 31 January 2027, and the migration work taking place through 2026 is already exposing legacy dependencies in alarm panels, lift lines, out-of-hours contacts and older CCTV transmission equipment. For trade buyers, the risk is not simply losing a dial tone. It is losing the signalling path that tells an alarm receiving centre (ARC) something has happened, or that carries a camera stream from a remote gatehouse to a central control room.

Why the copper retirement matters on live sites

The PSTN is not just a telephone service. It is the bearer for many analogue alarm transmitters, some lift emergency lines, older door-entry systems and a range of low-bandwidth telemetry. Openreach's stop-sell programme has been progressing exchange by exchange, and the final withdrawal date gives estates a fixed point to work towards. Sites that have already moved their broadband to fibre may still have an analogue line supporting a red-care or dual-com path. Sites that have not may be relying on ADSL over copper for both broadband and signalling. A survey that checks only the main phone line will miss these secondary dependencies.

Signalling options in 2026: IP-only, cellular and dual-path

IP-only signalling uses the site's broadband connection to send alarm events or camera streams to an ARC or control room. It is cost-effective where the broadband is reliable, monitored and supported by a UPS. The weakness is common-mode failure: if the router, fibre circuit or power fails, the signalling path disappears with it.

Cellular signalling uses 4G or 5G to provide an independent path. It avoids dependence on the site's fixed line, but it introduces questions about coverage, SIM data plans, carrier outage, antenna placement and power. A cellular transmitter in a basement plant room may pass a bench test and fail on site.

Dual-path signalling combines two bearers, typically IP plus cellular, and is often the pragmatic choice for monitored alarm systems where continuity matters. The two paths should be genuinely independent. An IP path and a cellular path that share the same power supply, switch or antenna are less resilient than the label suggests. For CCTV backhaul, dual-path may mean primary fibre with a cellular router for failover, or local recording with event upload over cellular. The right answer depends on whether the requirement is live viewing, evidence retrieval or alarm verification.

Auditing legacy panels and hidden dependencies

Start with a physical audit, not a desk exercise. Record every device that uses a telephone line, including alarm panels, CCTV transmitters, intercoms, lift lines, payment terminals and building management gateways. Note the make, model, firmware and signalling format. Check whether the panel supports an IP or cellular module, whether the ARC has been configured for that path, and whether the existing contract covers the change.

Then test the wider chain. A panel may be ready for IP, but the site may have no dedicated VLAN, no UPS and no out-of-hours access for commissioning. The ARC may need new receiver programming and test calls. The client may need to update keyholder details and response arrangements. These are not technical afterthoughts; they are the items that determine whether a migration finishes on time.

Agreeing migration costs with clients

Trade buyers should separate one-off capital costs from recurring charges. One-off costs include survey, hardware, installation, commissioning, ARC configuration and decommissioning of legacy lines. Recurring costs include SIM data, monitored IP paths, ARC signalling tariffs and maintenance. Presenting these as a single monthly figure can hide the true cost of ownership.

Be explicit about assumptions. If the site's broadband is out of scope, say so. If the client must provide a static IP, a VLAN or a power outlet, record it. If the cellular signal requires an external antenna, price it. If the ARC charges for additional paths, include it. A clear scope protects both parties and reduces the risk of variations during the cutover.

Avoiding downtime before the 2027 deadline

Plan cutovers in parallel where possible. Install and test the new path before removing the old one. Confirm that test signals reach the ARC and that camera streams are visible in the control room. Run a short parallel period so that both paths can be observed, then decommission the copper service in a controlled window. Keep a documented rollback plan and a temporary cellular fallback for sites that cannot tolerate loss of signalling.

Installer checklist

The 2027 deadline is not a reason to rush. It is a reason to audit early, specify independent paths and price the migration honestly. Sites that treat the PSTN retirement as a line replacement may end up with a working phone and a broken signalling chain.

All Articles

Related Articles

Control-Room Geometry: Matching LED Pitch to Operator Distance and 24/7 Duty

Control-Room Geometry: Matching LED Pitch to Operator Distance and 24/7 Duty

Lens Before Megapixels: Specifying ANPR and Forecourt Cameras for UK Sites

Lens Before Megapixels: Specifying ANPR and Forecourt Cameras for UK Sites

After Dark, After Rain: Specifying CCTV for UK Winter Sites in 2026

After Dark, After Rain: Specifying CCTV for UK Winter Sites in 2026